Beachside Fire Alarm Improvements

Demolition of existing manually, battery-operated fire alarm and smoke devices to provide an upgraded fire alarm system per current building codes. The Notifier fire alarm and detection system includes fire alarm control unit, remote annunciator, manual pull boxes, smoke detectors, and full area detections throughout all three (3) buildings - Pacific, Atlantic and Dining Hall (Beachside Village)

  • Total Project Cost: $4,685,133
  • Construction Start Date:  Summer 2025
  • Construction Completion Date: Summer 2025
  • Project Delivery Method: Construction Manager at Risk by Swinerton Builders
  • Architect: Gensler
  • University Design and Construction Team:
    • Project Manager: Ashley Bulaich
    • Construction Manager: Taylor Gibbons
    • Project Engineer: Ben Wilson
    • Inspector of Records: Ed Puga